AQI of Delhi

Photo: India Today

Delhi AQI Is Worse, Triggers Ban On Non-Essential Construction, Closure Of Schools

Severe Air Quality of National Capital Region (NCR)-Delhi triggered a ban on construction works, and closure of schools. According to sources, the concerned authority expressed health concern, as the Air Quality Index (AQI) fell to very poor category, on November 2. Alarmed by the situation, Centre's pollution control panel ordered an immediate ban on non-essential construction work, stone crushing and mining, along with four-wheelers odd-… read-more

Fri, 03 Nov 2023 - 09:02 AM / by Varsha Joshi

Tags: Delhi, air quality index, Pollution, CM Arvind Kejriwal, Schools, construction

Parliament building

Photo: Indian Express

PM Modi Inaugurates Parliament Building In Delhi

The most awaited Parliament Building, constructed at cost of Rs 970 crores, has been inaugurated in Delhi. Opposition parties like SP, YSRCP and others joined the historic moment of inauguration. The new building has a capacity to hold over 1,200 MPs, and have an assembly hall, dining hall, library. The new building in triangular shape is built with peacock theme, Lotus theme and other facilities. PM Modi inaugurated the building.

Sun, 28 May 2023 - 04:26 PM / by Varsha Joshi

Tags: PM Narendra Modi, New Parliament, Indian Politics, construction, BJP Government

Courtesy: Hindustan Times

Parel TT flyover

Photo: Hindustan Times

Parel TT Flyover In Dadar To Remain Shut

Owing to repair works undertaken by the BMC, the Parel TT flyover bridge will remain shut from 11pm to 6am till May 20, said the Mumbai traffic police. A notification in this regards was issued by Deputy Commissioner of Traffic Police (South) Gaurav Singh. The flyover, which is a major connect for commuters and daily travel is located in the region of Dadar and will remain shut.

Mon, 15 May 2023 - 09:05 AM / by Varsha Joshi

Tags: Dadar, Parel TT Flyover, shut, BMC, construction

LB Nagar Flyover

Photo: The Indian Express

KT Rama Rao To Inaugurate LB Nagar Flyover

The Telangana State Municipal Administration and Urban Development Minister KT Rama Rao is slated to inaugurate the LB Nagar RHS flyover. Taking to Twitter, the Bharat Rashtra Samithi (BRS) Minister said, the flyover is 760 meters long and 12 meters wide, with three lanes. It was built at a cost of ₹32 crore and is signal-free for traffic, providing a smooth ride from Vijayawada Highway to Hyderabad at LB Nagar.

Sat, 25 Mar 2023 - 04:30 PM / by Varsha Joshi

Tags: LB Nagar Flyover, KT Rama Rao, construction, Telangana Traffic, BRS

Courtesy: Twitter

Thane Kopri Bridge

Photo: First Post

Thane's Kopri Bridge All Set For Inauguration: Maharashtra

The Kopri rail overbridge, a Thane-Mumbai connector, is all set to be opened for traffic on February 9. The bridge will be inaugurated today, which is also CM Eknath Shinde's birthday. Taken up in 2018, the Kopri bridge will now have eight-lanes, making travel easier. The construction work was taken in a phased manner, while first phase was completed in 2022 October, the second phase is ready in January-2023.

Thu, 09 Feb 2023 - 11:25 AM / by Varsha Joshi

Tags: construction, Maharashtra CM, Eknath Shinde, Kopri Bridge, inauguration

Bridge Over Krishna River

Photo: The Indian Express

Central Govt Approves Cable-Cum Bridge Between AP & Telangana

The Central Government approved the pending cable-cum iconic bridge over the Krishna River, between the two states, Andhra Pradesh and Telangana. On October 13, Union Road Transport and Highways Minister Nitin Gadkari announced the same on Twitter, saying the Central Government will approve Rs 1,082.56 crore for the construction, which will be finished in a duration of a period of 30 months, which wil be second largest bridge in India.

Fri, 14 Oct 2022 - 04:08 PM / by Varsha Joshi

Tags: development projects, Andhra Pradesh, Telangana, construction, Nitin Gadkari

Courtesy: The Siasat Daily

PM Modi

Photo: Times Now

PM Modi Inaugurates First Phase Of Mahakal Lok In Ujjain

PM Narendra Modi inaugurated the awaited 900-metre-long 'Mahakal Lok' Corridor, in Ujjain, Madhya Pradesh. On October 11, at 5:30 pm, Modi inaugurated the first phase of the project, which will be a major boost to Ujjain Tourism, especially for pilgrims, visiting the Mahakaleshwar temple. The grandeur of Mahalkal Lok is unparalleled and this will add impetus to the global cultural significance of the country," said PM Modi.

Tue, 11 Oct 2022 - 09:00 PM / by Varsha Joshi

Tags: PM Narendra Modi, construction, Mahakal Lok Corridor, Ujjain, Tourism

Union Minister Nitin Gadkari

Photo: Hindustan Times

Nitin Gadkari Claims 70% Construction On Delhi-Mumbai Expressway Completed

Union Minister Nitin Gadkari stated at the Association of Consulting Civil Engineers (ACCE) National Conference for Civil Engineers and Professionals from Allied Industries that 70% of the construction on Delhi-Mumbai Express Highway is completed. He stated he hopes to cut the current time necessary to travel by road from Mumbai's… read-more

Sun, 21 Aug 2022 - 09:00 PM / by Vidhi Jhunjhunwala

Tags: Nitin Gadkari, construction, Delhi-Mumbai Expressway, Road construction, Delhi

Courtesy: Zee news

Larsen & Tourbo

Photo: Business Upturn

Larsen & Toubro Builds New Green Hydrogen Facility In Gujarat

Larsen & Toubro, global engineering and construction company, has opened its first green hydrogen plant in Gujarat. It is also in negotiations with a dozen corporations about establishing similar divisions, said an official on August 20. L&T intends to reach water neutrality by 2035 and carbon neutrality by 2040 as part of its environmental, social, and governance goals, making green hydrogen a vital aspect of its clean fuel adoption… read-more

Sat, 20 Aug 2022 - 08:25 PM / by Vidhi Jhunjhunwala

Tags: Larsen & Toubro, construction, green hydrogen plant, Gujarat

Courtesy: Free Press Journal

Mumbai Metro

Photo: Wall Street Journal

Mumbai Metro 3: Car Shed For Underground Line 3 On Track To Open In April 2023

Mumbai Metro Rail Corporation's (MMRC) managing director, Ashwini Bhide, declared on August 11 that car shed for subterranean Line 3 (Colaba-Bandra-SEEPZ) will be completed for Phase 1 operations by April 2023. Bhide stated development is proceeding at full speed, as Phase 1 is planned to open in December 2023. According to MMRC, 84% of Phase I civil construction is… read-more

Fri, 12 Aug 2022 - 11:20 AM / by Vidhi Jhunjhunwala

Tags: Mumbai, Metro, aaroy depot, Mumbai Metro Rail Corporation, construction